Footings poured and stem walls going up
The footings are poured and the masons are laying the concrete block stem walls, with vertical rebar set in the cells. Watch the first block go down. Next the stem walls are filled and compacted, the slab is prepped and poured, and the block walls and roof trusses follow over the next several weeks.