Roof complete, interior walls being framed
The roof is done, and the framing crew is now building the interior walls that lay out every room on both floors. In this walkthrough we go from the two-story great room, up the temporary stairs and through the second-floor suites, then out to the covered balcony overlooking the canal. Next come the rough trades: electrical, HVAC, gas and plumbing all run through these interior walls before insulation and drywall close them in. Watch the framing walkthrough.